İsdemir No. 1 Blast Furnace at night

Engineering since 1967

EKON is an international EPC contractor that builds complex industrial plants where every process demands precision.

Our projects

Recent projects: Sulfuric Acid · FGD · Carbon Black · Blast Furnaceİsdemir No. 1 Blast Furnace · İskenderun, Türkiye

60
years and counting
100+
completed projects
20.000 m²
of covered fabrication space
$1,2 billion+
in completed EPC contracts

Sectors

Turnkey plants across
heavy industry

Power stations and blast furnaces, cement works and chemical plants, sugar factories and infrastructure. Few contractors in Türkiye can match the breadth and depth of our turnkey experience, from design, fabrication and erection through to commissioning, all under one roof.

Power & Energy
Combined cycle, flue gas desulfurization, hydropower
Iron & Steel
Blast furnaces, continuous casting, gas recovery
Cement
Greenfield and integrated plants
Chemicals & Process
Sulfuric acid, sugar, carbon black
We also deliver
  • Hydropower and hydromechanical equipment
  • Flue gas treatment and electrostatic precipitators
  • Dust collection and environmental systems
  • Converter and blast furnace gas plants
  • Gas holders
  • Carbon black and petrochemicals
  • Sugar, food and beverage plants
  • Bridges and long-span steel structures
  • Post-earthquake repair and retrofitting
  • Equipment fabrication for export

Who we work with

Alongside technology leaders from Europe, the Americas, Japan and South Korea

Clients

  • İsdemir
  • Erdemir
  • OYAK
  • Votorantim
  • Cimpor Yibitaş
  • Ansaldo Energia
  • thyssenkrupp
  • Metso:Outotec
  • Weir
  • EÜAŞ
  • Eti Maden
  • Kardemir
  • SANKO
  • Carthage Cement
  • Kayseri Şeker
  • TUSAŞ
  • Air Liquide
  • Siemens
  • SPG

Technology partners

  • SMS group
  • Danieli
  • Paul Wurth
  • FLSmidth
  • Fives Cail
  • Maguin
  • Siemens
  • Doosan Škoda Power and Doosan LentjesŠkoda Power · Lentjes
  • Mitsubishi Power
  • Marubeni
  • GE
  • KHD Humboldt Wedag
  • DuPont MECS
  • INTECO
  • STF
  • Bilfinger
  • Altrad
  • Nippon Steel
  • Mitsui
  • Primetals Technologies
  • voestalpine
  • SMS Concast
  • AtkinsRéalis
  • Walker Engineering
  • Wood

Technology partnerships

World-class technology, delivered turnkey under one EPC contract

Clients get the right technology for each project, from the world's leading providers, with one contract and one point of responsibility. Technology partners get an EPC contractor that knows the site, the regulations and the local supply chain, and delivers from design through to performance testing.

What our technology partners bring

  • Process license and basic engineering
  • Critical equipment
  • Technical supervision and process guarantees

What EKON delivers as EPC contractor

  • Detailed engineering to Eurocode, ASME and EN standards
  • Local procurement, plus equipment and steelwork fabrication at EKONFAB
  • Civil works, mechanical and piping erection, electrical, instrumentation and automation
  • Tie-ins to operating plants, commissioning and performance testing
  • Permits and approvals, local compliance and site coordination with the client

Delivered together

Siemens
Germany
Ambarlı Natural Gas Combined Cycle Power Plant
We became the first Turkish contractor to take on a power plant conversion of this scale on an EPC basis. Two SGT5-4000F gas turbines were integrated into a plant built in the 1970s, with our joint venture responsible for everything from basic to detailed engineering.
Paul Wurth
Luxembourg
İsdemir No. 1 Blast Furnace
Supply, fabrication, civil works and erection as main contractor, with Paul Wurth blast furnace technology: Türkiye's largest blast furnace, built inside an operating integrated iron and steel plant without any loss of production.
FLSmidth
Denmark
Djebel Ressas Cement Plant, Tunisia
North Africa's most modern cement plant, built and completed in Tunisia through the Arab Spring. Consortium: FLSmidth provided basic engineering and critical equipment; EKON delivered detailed engineering, fabrication, civil works, erection and commissioning. More than 13.000 t of steelwork and equipment were fabricated in Ankara and shipped to site, and over half of the 1.400-strong workforce was recruited locally.
Ansaldo Energia
Italy
Yeni Elektrik 850 MW Combined Cycle
Ansaldo's local engineering, procurement, construction and erection contractor. Design in Ansaldo's 3D environment; 1.561 piping lines CE-certified under TÜV SÜD; 49 final quality dossiers.
Ballestra & DuPont MECS
Italy · USA
Emet Sulfuric Acid Plant
EPC with Ballestra as process licensor; all eight guaranteed values met in the performance test. 394 of 414 purchase orders went to Turkish manufacturers; handover with 349 quality dossiers.
Doosan Škoda Power
Czech Republic
Bandırma turbine-generator and modernization
Supply, installation and tie-in of a Doosan Škoda Power turbine-generator at an operating plant.
Walker · Davy McKee · SMS Demag
UK · Germany
Erdemir and İsdemir gas holders
Design, fabrication, erection and commissioning since 1995, including floating-piston gas holders of up to 60.000 m³. Main contractor at İsdemir.
FLS miljø
Denmark
Gela and Sulcis (Italy), West Burton (UK)
Six rotary gas-gas heaters, up to almost 20 m in diameter, fabricated and exported for European power stations. The UK order was delivered around five weeks early.
Doosan Lentjes
Germany
18 Mart Çan Flue Gas Desulfurization
Turnkey EPC using Doosan Lentjes wet limestone technology, achieving 98,5% SO₂ removal.
Tractebel
Belgium
Yeni Elektrik 850 MW Combined Cycle
The owner's engineer on the project; we worked closely with Tractebel through design review, construction and commissioning.
FLSmidth
Denmark
Nyumba Ya Akiba Cement Plant, DR Congo
Civil design to Eurocodes, plus fabrication and shipment of the structural steelwork.

Achievements

We deliver what has not yet been attempted.

Türkiye's largest, the country's first, or finished in record time: that is the kind of project that carries the EKON name.

İsdemir No. 1 Blast Furnace and hot blast stoves at nightİsdemir No. 1 Blast Furnace · İskenderun
01 · İsdemir No. 1 Blast Furnace · İskenderun
Adjacent production never interrupted

Türkiye's largest blast furnace, built at the heart of an operating integrated iron and steel plant

We replaced a 50-year-old furnace with the steel shop on one side and the live No. 2 furnace on the other. Throughout, 220-metric-ton torpedo cars of molten iron at 1.300 °C kept running straight through the construction site. We lifted 230-metric-ton modules into place with 1.000-metric-ton cranes and lowered a telehandler inside the furnace shell to fit the stave plates. The structure came through the February 2023 earthquakes undamaged, and İsdemir lost no production. The furnace was tapping hot metal 45 days after technical acceptance.

02 · Ambarlı Natural Gas Combined Cycle Power Plant · Istanbul
36% → 54%
Plant efficiency

We rebuilt a power station from the ground up as a combined cycle plant

The first Turkish contractor to take on a project of this scale on an EPC basis.

We converted Ambarlı's 300 MW oil-fired units into an 816 MW dual-fuel combined cycle plant. Projects of this kind are rare anywhere in the world; this one was delivered without a foreign contracting partner, entirely by Turkish engineering teams.

Ambarlı 816 MW Combined Cycle Power PlantAmbarlı Natural Gas Combined Cycle Power Plant · Istanbul
18 Mart Çan Flue Gas Desulfurization Plant18 Mart Çan Flue Gas Desulfurization Plant · Çanakkale
03 · 18 Mart Çan Flue Gas Desulfurization Plant · Çanakkale
98,5%

Türkiye's most efficient flue gas desulfurization plant

We built a turnkey wet FGD plant for both units of the 18 Mart Çan power station and integrated it into the running plant. It removes 98,5% of SO₂, and we stayed on for two years of operational supervision.

04 · Eti Maden Emet Sulfuric Acid Plant · Kütahya
8 / 8

Delivered through a currency crisis, a pandemic, an earthquake and a mid-project technology handover

We built Eti Maden's 350.000 t/y sulfuric acid plant at Emet on a turnkey basis. By recovering waste heat from the process, the plant generates 15 MW of electricity, almost twice what it consumes. Midway through the project, the process technology scope had to be transferred to a new licensor, Ballestra. We managed that handover while construction and tie-ins to Eti Maden's operating facilities continued without interruption. In the three-day performance test, the plant met all eight guaranteed values, including output, purity, emissions and consumption, most of them with a margin.

The most critical guaranteed values

99,841%
SO₂ conversion
spec ≥ 99,8%
99,998%
Absorption efficiency
spec ≥ 99,9%
1,031 kg/t
SO₂ emissions
spec ≤ 1,15
14,33 mg/Nm³
Acid mist + SO₃
spec ≤ 45
Eti Maden Emet Sulfuric Acid Plant, aerial viewEti Maden Emet Sulfuric Acid Plant · Kütahya
Çimko Narlı Cement Plant, preheater towerÇimko Narlı Cement Plant · Kahramanmaraş
05 · Çimko Narlı Cement Plant · Kahramanmaraş
18 months

Türkiye's largest single-line cement plant of its day, completed in record time

Sanko Holding's 7.500 t/d Çimko Narlı clinker line was commissioned in 18 months. A plant of almost the same capacity, built directly across from it at the same time, was still unfinished after 36 months. Sixteen years later, on 6 February 2023, Pazarcık, where Narlı stands, was the epicenter of the first and most powerful of the Kahramanmaraş earthquakes. The damage assessment was carried out by what was then one of our group companies: the plant, including its 130-meter preheater tower, came through virtually unscathed.

06 · Afşin-Elbistan B Thermal Power Plant · Kahramanmaraş
Just 7 meters to work in

A 7-meter gap for the cranes: rebuilding a fire-damaged 360 MW unit

At Afşin-Elbistan B, fire had wrecked Unit 2's boiler house above the +62 m level. The only crane access was a 7-meter gap between the Unit 2 and Unit 3 boiler houses. Into it we erected two luffing-jib tower cranes from our own fleet, chosen because they work almost vertically, the highest at +123 m. We removed more than 600 t of heat-distorted steel without compromising the structure, then erected over 720 t of new steelwork and two 340-metric-ton vapor filters and pulled 170 km of cable. At peak, 370 people were on site; the job took 1,15 million man-hours. Trial operation ran without a single stoppage attributable to our scope, the unit ran for 72 hours non-stop at full load, and provisional acceptance was signed with no punch list.

Luffing-jib tower crane in the 7-meter gap between two boiler houses at Afşin-Elbistan BAfşin-Elbistan B Thermal Power Plant · Kahramanmaraş
Djebel Ressas Cement Plant, preheater tower and raw meal siloDjebel Ressas Cement Plant · Tunisia
07 · Djebel Ressas Cement Plant · Tunisia
Through the Arab Spring

North Africa's most modern cement plant

For Carthage Cement, we built the 5.800 t/d clinker plant at Djebel Ressas, about 25 km from Tunis, in a consortium with FLSmidth. FLSmidth provided the basic engineering and critical equipment; detailed engineering, fabrication, civil works, erection and commissioning were ours. Construction ran through the Arab Spring, which began in Tunisia, during the most turbulent period in the country's recent history. We poured 110.000 m³ of concrete and erected 7.800 metric tons of structural steel and 12.500 metric tons of mechanical equipment. More than half of the 1.400-strong site workforce was Tunisian. Carthage Cement's 2013 letter of commendation records 4,45 million man-hours.

08 · Boğazlıyan Sugar Factory · Yozgat
10.000 metric tons of beet per day

Türkiye's largest and most modern sugar factory of its day

Kayseri Şeker's largest investment, the Boğazlıyan Sugar Factory slices 10.000 metric tons of beet a day. We delivered it on a turnkey basis as the OYAK–EKON–PROKON joint venture, together with the French technology partners Fives Cail and Maguin. The 920.000 m² plant was brought into operation on 3 December 2006, 17 months after contract signature. It includes a 60.000-metric-ton horizontal sugar silo, a 20.000-metric-ton packed sugar store and a 2 × 8 MW power plant that generates its own electricity. Its first regular campaign processed 600.000 metric tons of beet into 81.000 metric tons of sugar.

Boğazlıyan Sugar Factory, aerial viewBoğazlıyan Sugar Factory · Yozgat

Some more firsts and mosts

Highest-capacity single-line cement plant

Çimko Narlı, 7.500 t/d clinker, operational in 18 months

Longest steel arch bridge span

Samsun Ayvacık Eynel Bridge, 216 m single span

Largest and most modern sugar factory

Boğazlıyan, 10.000 t/d, in operation 17 months after contract

Türkiye's first carbon black plant

İskenderun, under construction

Samsun Ayvacık Eynel Bridge
Samsun Ayvacık Eynel Bridge · 216 m single-span steel arch

Project gallery

From our project portfolio

A selection of the plants we have built over more than fifty years in power, iron and steel, cement and sugar.

Yeni Elektrik 850 MW Combined Cycle Power Plant · Gebze
Yeni Elektrik 850 MW Combined Cycle Power Plant · Gebze
Çimko Narlı, circular storage roof erection · Kahramanmaraş
Çimko Narlı, circular storage roof erection · Kahramanmaraş
İsdemir continuous casting plant · İskenderun
İsdemir continuous casting plant · İskenderun
Djebel Ressas Cement Plant · Tunisia
Djebel Ressas Cement Plant · Tunisia
İsdemir No. 3 Blast Furnace modernization · İskenderun
İsdemir No. 3 Blast Furnace modernization · İskenderun
Cimpor Hasanoğlan 2.500 t/d clinker line · Ankara
Cimpor Hasanoğlan 2.500 t/d clinker line · Ankara
İsdemir blast furnace and converter gas storage · İskenderun
İsdemir blast furnace and converter gas storage · İskenderun
İsdemir ore preparation plant · İskenderun
İsdemir ore preparation plant · İskenderun
Yedigöze Sani Bey Dam and HEPP · Adana
Yedigöze Sani Bey Dam and HEPP · Adana
Boğazlıyan Sugar Factory, 10.000 t/d · Yozgat
Boğazlıyan Sugar Factory, 10.000 t/d · Yozgat
İsdemir hot strip mill · İskenderun
İsdemir hot strip mill · İskenderun
Yeni Elektrik 850 MW, gas turbine halls · Gebze
Yeni Elektrik 850 MW, gas turbine halls · Gebze

Health and safety

In live plants and the toughest conditions, our colleagues' wellbeing comes first

On one project, torpedo cars carrying molten iron crossed the middle of our site every hour for three years. We have worked next to plants with recurring toxic gas releases, in confined spaces or fire-damaged structures, and with flammable or corrosive materials such as sulfur dust or acid. Our crews work in vertically overlapping work zones, across many disciplines at once, at great heights or in remote locations. Whatever the conditions or site rules, we apply world-class HSE supervision. Our aim is not to grow a lost-time-free counter. We encourage as many hazard reports and observations from the field as possible and close out every one, so that hazards are controlled before they can cause harm.

10 million+
man-hours
İsdemir No. 1 Blast Furnace, TRT and underground bunker projects
No fatalities or serious injuries
4,45 million
man-hours
Djebel Ressas Cement Plant, Tunisia
Carthage Cement letter of commendation, 2013
4 million
man-hours
Yeni Elektrik 850 MW, up to first fire of gas turbine 1
Commendation from Ansaldo (Yeni AEN İnşaat), 2013
1,5 million
man-hours
Cimpor Hasanoğlan Cement Plant
Cimpor Yibitaş letter of commendation, 2009

Our occupational health and safety management system is certified to ISO 45001 by TÜV Rheinland.

History

Beyond half a century, and counting

  1. 1967
    Hasan Özdemir in his early years

    Hasan Özdemir begins his career building industrial plants

  2. 1974
    Prokon groundbreaking ceremony

    Prokon Engineering is founded

  3. 1985
    EKON founding notice, Turkish Trade Registry Gazette, 14 February 1985

    EKON Endüstri İnşaat ve Ticaret A.Ş. is founded

  4. 1986

    EKON's first job: design and fabrication of the handling equipment for the 180-metric-ton stator at Çatalağzı Power Plant is completed

  5. 1992

    The 12.000 m² space-frame roof of the Istanbul World Trade Center is completed

  6. 1999

    Converter off-gas cooling and cleaning plant completed at Karabük Iron and Steel Works

  7. 2003

    2 × 1.000.000 t/y continuous casting unit completed at İsdemir

  8. 2005

    Contract for Boğazlıyan Sugar Factory, Türkiye's largest

  9. 2006
    Cold box erection at the İsdemir No. 6 Air Separation Plant

    İsdemir No. 6 Air Separation Plant completed

  10. 2006

    Contract for Sanko's 7.500 t/d Çimko Narlı cement plant

  11. 2007
    Samsun Ayvacık Eynel Bridge

    Contract for the Samsun Ayvacık Eynel Bridge, Türkiye's longest steel arch span

  12. 2007

    İsdemir No. 3 Blast Furnace modernization completed

  13. 2008

    Contract for the 816 MW combined cycle conversion at Ambarlı

  14. 2009

    Cimpor Hasanoğlan 2.500 t/d clinker line completed on a turnkey basis

  15. 2010

    Contract for the 5.800 t/d Djebel Ressas cement plant in Tunisia

  16. 2010

    Water intake, spillway and hydromechanical equipment completed at Yedigöze Sani Bey Dam and HEPP

  17. 2013

    Ambarlı combined cycle conversion and the Yeni Elektrik 850 MW plant in Gebze are completed

  18. 2014

    Djebel Ressas, North Africa's most modern cement plant, is completed

  19. 2017
    Afşin-Elbistan B thermal power plant, aerial view

    Fire-damaged Unit 2 at Afşin-Elbistan B returns to service

  20. 2018
    Emet sulfuric acid plant, top-down aerial view

    Contract for the 350.000 t/y Emet sulfuric acid plant

  21. 2021

    Construction begins on İsdemir No. 1 Blast Furnace, Türkiye's largest

  22. 2023

    18 Mart Çan 2 × 160 MW FGD plant completed

  23. 2024

    Contract for the İskenderun carbon black plant, Türkiye's first

  24. 2024

    İsdemir No. 1 Blast Furnace is commissioned

  25. 2025

    Emet sulfuric acid plant is commissioned and reaches provisional acceptance

  26. 2026
    Eti Maden Bandırma turbine-generator plant, aerial view

    Eti Maden Bandırma 36 MW turbine-generator plant reaches provisional acceptance

Our team

Fifty-year veterans and a new generation of engineers: deep roots, modern outlook

More than fifty years of field experience under our founder, Hasan Özdemir, form the foundation of the company, and the handover to the next generation is complete, within a formal corporate structure. People who have spent four decades building blast furnaces, power stations and cement works now work side by side with young engineers using digital tools. Know-how is passed on in live projects, not textbooks.

550
direct employees today
1.250+
currently on site, including subcontractors
50+ years
of our founder in the field
Engineering, fabrication and site under one roof

Civil, mechanical, electrical, instrumentation, automation and process teams work on the same project under the same management.

Our own crews for critical work

Heavy lifts, work inside the furnace and commissioning are done by our own people.

An international way of working

We work seamlessly with our European technology partners as one team, to international codes and established project management practice.

Our values

An inclusive team from day one

Heavy industry was long a field where women were rarely seen on site or in the engineering office. At EKON and across our group companies of the time, women engineers, designers and technical and administrative staff have been a natural part of the team since the early years. We carry that merit-based, inclusive culture forward today.

The EKON team in the 1980s, in front of the office building
The EKON and group companies team, 1980s
EKON head office team in the courtyard of the Kahramankazan headquarters
EKON head office team · Kahramankazan, Ankara · 2025

Fabrication

We build the critical equipment in our own manufacturing plant

Our group company EKONFAB (Ekon İmalat Mühendislik A.Ş.) designs and manufactures large, high-precision equipment to ASME and EN codes in a 20.000 m² covered manufacturing plant: pressure vessels, tanks and silos, process equipment, heat exchangers and pipe spools. We work in carbon, stainless and high-alloy steels such as Alloy 31, super duplex and Inconel, and supply CE-marked equipment under the Pressure Equipment Directive. As a group, we have fabricated and delivered more than 200.000 metric tons of structural steel and mechanical equipment.

EKONFAB is more than the trusted maker of high-quality process equipment for EKON's own projects. It is a sought-after supplier to leading technology companies around the world for stainless and carbon steel equipment and piping. Its customers include Metso, Weir Minerals, thyssenkrupp, FLSmidth, SMS group, KHD Humboldt Wedag and Fives, as well as mining companies and the sugar and chemical industries. EKONFAB's rapid growth is built on repeat and exclusive orders from these companies.

Visit EKONFAB ↗
Fabrication of a giant ring main at the EKONFAB manufacturing plant
The Prokon İmalat team in front of the workshop
Then · 2005 · The Prokon İmalat workshop and team, structural steel fabrication
The EKONFAB team in front of the fabrication hall, aerial view
Now · 2025 · EKONFAB, process equipment manufacturing

Group companies and affiliates

One roof, five specialties

EKON · Group parent company
Turnkey EPC for heavy industry

Large-scale industrial plants in power, iron and steel, cement and chemicals, from engineering, fabrication and erection through to commissioning.

EKONFAB, an EKON group company
Precision manufacturing

High-precision pressure vessels, process equipment and piping, for EKON's projects and for leading technology suppliers worldwide.

Visit EKONFAB ↗
Prokon İmalat, an EKON group company
Structural steel at scale

Large-tonnage structural steel, fabricated and erected for industrial plants, buildings and infrastructure.

Sadaş Sigorta, an EKON affiliate
Insurance for industrial projects

Insurance across every line, from construction, erection and machinery breakdown to cargo and liability cover.

Visit Sadaş ↗
Proya, an EKON affiliate
3D structural engineering software

COMOSYS, software that models, analyzes, designs and details heavy industrial structures, used across the cement, energy and steel industries.

Visit Proya ↗

Energy transition

Plants that reduce emissions and recover energy

As industry decarbonizes, the plants it needs are the kind we already build: plants that turn waste heat into power, recover gas, clean flue gas and step up efficiency.

Waste heat to power
Emet Sulfuric Acid Plant

Process heat recovery generates 15 MW of electricity, almost twice what the plant consumes.

Top-gas energy recovery
İsdemir No. 1 Blast Furnace TRT

Civil works and erection for the top-pressure recovery turbine that turns blast furnace top gas into 13,5 MW of electricity.

Emission control
18 Mart Çan FGD

Türkiye's most efficient flue gas desulfurization plant, removing 98,5% of SO₂.

Gas recovery
Erdemir and İsdemir gas holders

Gas holders of up to 60.000 m³ that recover blast furnace and converter gas as fuel.

Efficiency step-change
Ambarlı combined cycle

Converting an oil-fired station to combined cycle raised efficiency from 36% to 54%.

Toward green steel
Electric arc furnaces and continuous casting

More than thirty years of work on electric arc furnaces, ladle furnaces and continuous casters; ready for new EAF and DRI-based steel investments.

EKON campus in Kahramankazan with solar-roofed fabrication halls and woodland, aerial view

Sustainability

A green campus, and a factory that runs on its own power

We have planted 5.000 trees on our campus in Kahramankazan, Ankara, and our fabrication plant generates the electricity it uses from its own 1.260 kWp rooftop solar plant, the first rooftop solar plant in Türkiye. Every piece of equipment we fabricate starts with a lower carbon footprint before it leaves the plant.

5.000
trees
1.260 kWp
rooftop solar
Certifications ISO 9001 · ISO 14001 · ISO 45001 (TÜV Rheinland) Class A Contractor License (Türkiye) Avetta member ASME U · U2 · S (EKONFAB)

Let's talk about your next challenging project.

Get in touch